5 backbone data centers in Dongguan · One price, four line types

Dongguan Server Colocation
From 1U, ¥6,000/year

Telecom, China Mobile, China Unicom and carrier-neutral facilities — same price, your choice. Includes 1 IP and 100M shared bandwidth; add ¥1,000 to upgrade to 10M dedicated, with 7×24 on-site operations.

¥6,000/year
1U rack space and up
5sites
Dongguan data centers
99.99%
Network availability
7×24hrs
On-site engineers
Reference pricing

One price list, four data centers to choose from

Same rack space, same bandwidth — Telecom, China Mobile, China Unicom and carrier-neutral data centers at one price. The only difference is the network exit: pick the line that matches your users, without paying extra for it.

Let's be clear: 100M shared is not 100M dedicated. The shared bandwidth on this page is specified as 5M peak, 2M guaranteed — a good fit for corporate websites, mini-program backends, office systems and other light-to-moderate traffic. If you need to sustain full throughput, add ¥1,000 to upgrade to 10M dedicated.
Dongguan server colocation rack pricing, in CNY per year
Rack space Reference price (annual) Average per month Upgrade to 10M dedicated Power allowance Best for
1U ¥6,000 / yr ~500 / mo +¥1,000 ≤ 350W Single 1U server
2U ¥6,500 / yr ~542 / mo +¥1,000 ≤ 400W Single 2U server
4U ¥9,500 / yr ~792 / mo +¥1,000 ≤ 650W Single 4U / storage server

← Swipe to see the full price list →

· Includes 1 IP and 100M shared bandwidth (5M peak / 2M guaranteed) · Above the power allowance: ¥350 / month / 1A · Prices are for reference; promotions run from time to time — ask our team for the current offer
Choosing a data center

Four data center types, one price

Our facilities are in Dongcheng District and Dalang Town, split between carrier data centers and self-built / neutral data centers. The price is identical — what you choose is the network exit.

Carrier data center

China Telecom data center

Direct China Telecom backbone exit in Dongguan. Strong coverage of Telecom users in southern China — ideal when most of your traffic comes from Telecom broadband.

Reference priceFrom ¥6,000 / year

Best for: corporate websites, office systems, applications serving South China users

Carrier data center

China Mobile data center

Direct China Mobile backbone exit in Dongguan. Lower latency for businesses whose traffic comes largely from mobile users.

Reference priceFrom ¥6,000 / year

Best for: mini-program backends, mobile apps, users in lower-tier cities

Carrier data center

China Unicom data center

Direct China Unicom backbone exit in Dongguan. A good fit for businesses with many Unicom users in northern China or a latency-sensitive Unicom audience.

Reference priceFrom ¥6,000 / year

Best for: northern-China audiences and businesses that put the Unicom line first

Self-built / neutral data center

Neutral data center

Telecom, Unicom, Mobile, dual-line and BGP access are all available, so you can switch lines as your business changes without being tied to one carrier.

Reference priceFrom ¥6,000 / year

Best for: nationwide audiences needing multi-line redundancy and BGP smart routing

· Moving from single Telecom to BGP multi-line? Ask our team for a dedicated offer · Every facility supports multi-line connectivity; the lines available depend on each site's actual resources

Choosing rack space

1U, 2U, 4U — the difference is more than space

Bigger rack space costs more overall, but the cost per U actually falls. Start with your hardware's dimensions and power draw, then do the maths.

1U

Single 1U server · ¥6,000/year

Chassis 550×425×44.5mm, power ≤350W. One machine for one site — all you need.

2U

Single 2U server · ¥6,500/year

Chassis 550×425×89mm, power ≤400W. Most multi-bay, dual-PSU machines are 2U.

4U

Single 4U / storage server · ¥9,500/year

Chassis 550×425×178mm, power ≤650W. The right tier for storage servers, GPU cards and multi-drive arrays.

Not sure which to pick? Send the model number to our team and we'll recommend rack space from its actual dimensions and power draw — so you don't overpay for space you won't use, or find your hardware won't fit.

Cost per U, per month

Based on annual pricing — the larger the rack space, the lower the cost per U

1U rack space¥500 / U / mo
2U rack space¥271 / U / mo
4U rack space¥198 / U / mo
For the same machine, 4U space costs just ¥198 per U — 60% less than 1U. If your hardware is already 2U or 4U, choose the matching rack space and save.
Facility standards

What a T3+ / T4 data center actually looks like

Five Dongguan data centers, with power, cooling, fire suppression, security and network all designed to T3+ and T4 standards and run by a professional operations team.

Network

Multiple carrier exits, one primary and one backup. Single-carrier sites offer Telecom, Mobile or Unicom; the neutral site supports dual-line, tri-line or BGP.

Power

Dual power feeds plus diesel generators with 24 hours of fuel reserve; 2N redundant high-frequency UPS with more than 15 minutes of battery runtime.

Cooling

Air-cooled chilled water with free cooling, contained cold aisles and precision air delivery inside the hall to eliminate hot spots.

Security

CCTV covers the colocation area and every entrance, access-control records are kept for 6 months, and power and building-automation monitoring run alongside.

Fire suppression

A piped gas suppression system using FM200 blended compressed gas as the extinguishing agent — effective against fire without damaging equipment.

Service

7×24 on-site technical support and real-time monitoring. Reboots, disk swaps, cable checks — one call brings an engineer to your rack.

Why Dongguan

Dongguan keeps costs down without limiting reach

01

A core Guangdong backbone exit

Dongguan is one of ChinaNet's core backbone exits in Guangdong and a core backbone node city, so traffic from across the country takes a shorter, more direct path.

02

Five data centers built to T3+ / T4 standards

Five Dongguan data centers, self-operated and partnered, with power, cooling, fire suppression and security designed to T3+ and T4 standards — pick the site closest to your business.

03

99.99% availability

Primary and backup exits, dual power feeds with diesel generators and 7×24 on-site staffing keep the risk of interruption to an absolute minimum.

Onboarding

Four steps from enquiry to handover

1

Tell us what you need

Share your hardware dimensions, power draw, bandwidth and workload, and our team recommends rack space and a line based on live facility capacity.

2

Confirm and sign

Agree the facility, rack space, bandwidth, IP count and contract term, then sign and pay to lock in your space.

3

Install your hardware

Ship or deliver your equipment to the facility; on-site engineers handle racking, cabling and power-up, with progress you can follow throughout.

4

Handover and acceptance

We assign IPs, activate bandwidth and run joint tests on connectivity and real throughput — you take delivery once everything checks out.

FAQ

A few things to settle before you order

Is 100M shared the same as 100M dedicated?
No. 100M shared here means a shared port, specified as 5M peak and 2M guaranteed. It suits corporate websites, mini-program backends and office systems with light-to-moderate traffic. If your business needs to sustain full bandwidth, add ¥1,000 to upgrade to 10M dedicated.
The four data center types cost the same — so what's the difference?
The difference is the network exit, not the rack. Telecom, Mobile and Unicom facilities provide a single-carrier backbone exit; the self-built / neutral facility can connect via Telecom, Unicom, Mobile, dual-line or BGP. Which one you pick depends on the networks your users are on.
How many IPs come with a rack space?
Each rack space includes 1 IP. If you need more IPs or a separate IP block, let us know in advance and we'll apply under the facility's policy.
What if my hardware draws more power than the allowance?
Each rack size has a power allowance: 1U ≤350W, 2U ≤400W, 4U ≤650W. Usage above that is billed at ¥350 / month / 1A, so tell us the rated power before you order and avoid a surcharge after installation.
Where are the data centers in Dongguan? Can I visit?
Our facilities are in Dongcheng District and Dalang Town — five data centers in total. You're welcome to visit and inspect the racks and operations environment; just call one day ahead to book.
Can I upgrade to BGP multi-line?
Yes. Upgrading from single Telecom to BGP multi-line comes with a dedicated offer from our team. The neutral facility already supports multi-line access, and you can switch lines later as needed.
Is the listed price final? Are there promotions?
Prices on this page are for reference. We run promotions from time to time, and the discount depends on the contract term — contact our team for the current offer.
Get a quote

Send us a model number,
and we'll cost it out in ten minutes.

Tell us your hardware dimensions, power draw and workload, and we'll come straight back with a facility, rack space and bandwidth combination — and confirm whether a promotion is running.

  • Rack space recommended from your hardware's real dimensions — we won't upsell you
  • Four data center types side by side, one price, your choice of line
  • 7×24 on-site engineers, on the floor on installation day

Three ways to reach us — pick one

Sales hotline · 7×24
Dedicated account manager online 9:00–18:00 on business days
Business email
Include your hardware model and bandwidth needs — we reply the same day
Colocation locations · Dongguan
Dongcheng District, Dalang Town
5 data centers in total
Site visits by appointment — call one day ahead to register
Call 134-3028-0788 Or email tym@zifu.net with your hardware model and bandwidth requirements